• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Model for Collecting Replacement Cycles of Building Components: Hybrid Approach of Indirect and Direct Estimations

    Thumbnail
    View/Open
    %28ASCE%29CP.1943-5487.0000795.pdf (751.8Kb)
    Date
    2018
    Author
    Kim Jonghyeob;Lee Hyun Woo;Bender William;Hyun Chang-Taek
    Metadata
    Show full item record
    Abstract
    Building maintenance, repair, and replacement (MR&R) costs are estimated to be two to three times larger than initial construction costs. Thus, it is important to accurately estimate and manage MR&R costs in the planning phase and/or design phase of a construction project based on life cycle cost analysis (LCCA). However, the nature of LCCA requires making necessary assumptions for the prediction and analysis of MR&R costs, and the reliability of the assumptions greatly impacts LCCA results. In particular, determining reasonable replacement cycles is especially important given that each replacement typically involves a significant amount of capital. However, conventional approaches largely focus on either collecting component-specific replacement cases or surveying expert opinions, both of which reduce the usability and reliability of replacement cycle data at an early stage. To overcome these limitations, this study aims to develop a replacement cycle collection model that can expedite the data collection by combining indirect estimations with direct estimations. The development of the model involves collecting replacement cases, developing replacement cycle and index estimation methods, and developing an algorithm to implement the suggested model. As a validation, the applicability and effectiveness of the model were illustrated and tested by using simulated cases based on 21 real-world facilities. This study makes a theoretical contribution to the body of knowledge by developing a replacement cycle data collection model based on long-term and macro perspectives. The developed model will also be of value to practitioners when they try to improve the reliability of their LCCA.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4248656
    Collections
    • Journal of Computing in Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV