• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Structural Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Structural Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Steel Coupling Beams with a Replaceable Fuse

    Thumbnail
    View/Open
    %28ASCE%29ST.1943-541X.0001939.pdf (1.714Mb)
    Date
    2018
    Author
    Shahrooz Bahram M.;Fortney Patrick J.;Harries Kent A.
    Metadata
    Show full item record
    Abstract
    Steel coupling beams have emerged as a viable alternative to conventionally and diagonally reinforced concrete coupling beams because of their superior energy-dissipation characteristics, smaller member depth, and ease of construction, to name but a few advantages. Conventional steel coupling beams are designed to yield under design-level ground motions; hence, postevent repair requires replacement of the entire beam that is embedded into wall piers and interfaced with a significant amount of wall pier reinforcement. Such a repair will be costly, intrusive, and very likely impractical. A new system involving a replaceable midspan fuse located in the coupling beam was developed. In this system, the fuse acts as the primary energy-dissipating component, while the remainder of the beam span and its embedments into the wall piers remain elastic when the building is subjected to design-level ground motions. Hence, it is only necessary to replace the accessible damaged fuses since the rest of the beam and wall piers remain undamaged. This paper presents a design methodology for using steel coupling beams that have a replaceable fuse. Laboratory test data were found to validate the methodology. A 2-story prototype building was designed according to the proposed methodology and results from nonlinear static and dynamic analyses indicate that the building performed according to the objectives of the presented design methodology. That is, (1) the midspan fuses are the primary energy-dissipating components; (2) the fuses develop their capacity before the embedded beams reach their expected shear or elastic flexural capacities; (3) the wall piers experience little or no damage under design ground motions; (4) the wall piers maintain their integrity for maximum credible ground motions; and (5) residual deformations are small, permitting new fuses to be installed following design-level ground motions.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4248419
    Collections
    • Journal of Structural Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV