Show simple item record

dc.contributor.authorZhou Jianjun;Chen Diming;Wang Dongyuan;Zhang Lu-Lu;Zhang Li-Min
dc.date.accessioned2019-02-26T07:36:28Z
dc.date.available2019-02-26T07:36:28Z
dc.date.issued2018
dc.identifier.otherAJRUA6.0000981.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4248222
dc.description.abstractThis paper compiles a database consisting of 16 tunnel excavation projects in clayey soils using the earth pressure balance (EPB) tunneling method. Statistical analysis of the data is performed and the probability distributions for ground loss ratio η and fitting parameter n, which are two major parameters in Peck’s formula for transverse surface settlement, are identified based on 78 and 29 points of field data, respectively. The correlation between η and n is fitted based on the data and its influences on the failure probability is evaluated. A serviceability performance function is modeled based on Peck’s settlement formula, and the serviceability failure probability is defined and analyzed with Monte Carlo simulations. A series of design charts, in terms of tunnel diameter, cover/diameter ratio, η, and n, are generated for practical uses without running Monte Carlo simulations.
dc.publisherAmerican Society of Civil Engineers
dc.titleFailure Probability of Transverse Surface Settlement Induced by EPB Shield Tunneling in Clayey Soils
dc.typeJournal Paper
dc.journal.volume4
dc.journal.issue3
dc.journal.titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
dc.identifier.doi10.1061/AJRUA6.0000981
dc.page4018030
dc.treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2018:;Volume ( 004 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record