Show simple item record

dc.contributor.authorSu Youli
dc.date.accessioned2017-12-30T13:06:40Z
dc.date.available2017-12-30T13:06:40Z
dc.date.issued2016
dc.identifier.other%28ASCE%29EY.1943-7897.0000318.pdf
dc.identifier.urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245749
dc.description.abstractThis paper presents a new approach to estimate wind speed and install a wind power turbine (WPT) in a power system. The entire installation procedure includes selecting appropriate buses and verifying the power system after installing the WPT. Two reliability indices, the power index in crisis time (PICT) and the endurance index of crisis hours (EICH), were developed and used for determining the reliability level of target buses for WPT installation. The stability and reliability of the hybrid power system formed was verified by determining the reference frequency and voltage. The results described in this paper can be applied to other small power systems using distributed generation, such as hydroelectric power generation.
dc.publisherAmerican Society of Civil Engineers
dc.titleNew Approach for the Optimal Allocation of Wind Power in a Rural Power System
dc.typeJournal Paper
dc.journal.volume142
dc.journal.issue3
dc.journal.titleJournal of Energy Engineering
dc.identifier.doi10.1061/(ASCE)EY.1943-7897.0000318
dc.page04015046
dc.treeJournal of Energy Engineering:;2016:;Volume ( 142 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record