• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Cloudy with a Chance of Fuzzy: Building a Multicriteria Uncertainty Model for Construction Project Delivery Selection

    Thumbnail
    View/Open
    %28ASCE%29CP.1943-5487.0000614.pdf (998.8Kb)
    Date
    2017
    Author
    Hector Martin
    Timothy M. Lewis
    Andrew Petersen
    Everson Peters
    Metadata
    Show full item record
    Abstract
    The process of choosing a project delivery method is infused with cognitive uncertainties associated with the decision maker. Fuzzy uncertainties arise because of imprecise understanding and subsequent representation of these uncertainties by the decision maker, whereas random uncertainties arise from variance of these imprecisions. Since there are no well-defined rules for spontaneous decisions, in order to be consistently confident in the appropriateness of the chosen delivery method, a structured approach incorporating uncertainty is required. Previously unanswered questions such as (1) what are the sources of uncertainty in project delivery decisions, (2) how do decision makers conceptualize uncertainties, and (3) how the use of existing models increase or decrease uncertainty, were investigated. The answer to these questions revealed that while fuzziness has been accounted for in present procurement theory, the modeling of randomness has been neglected. Therefore, a forward normal cloud model that uses a normal distribution membership function was built to rank decision makers’ preferences. This proposed approach provides a better conceptualization of project delivery decision making, and is shown to be more sensitive in distinguishing alternatives compared on factors, than the interval analytical hierarchy process (AHP) rough-set approach. Survey results showed statistical significance (p<0.05) for the model’s reliability in choosing the preferred delivery method. Overall, construction decision makers can be confident that conflicting project outcomes will less likely result from their recommendations as the proposed cloud model enables clients to perform quantitative calculations incorporating a wider spectrum of uncertainties in their decision.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4245526
    Collections
    • Journal of Computing in Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV