Show simple item record

dc.contributor.authorDuc-Hoc Tran
dc.contributor.authorMin-Yuan Cheng
dc.contributor.authorMinh-Tu Cao
dc.date.accessioned2017-12-30T13:05:19Z
dc.date.available2017-12-30T13:05:19Z
dc.date.issued2016
dc.identifier.other%28ASCE%29CP.1943-5487.0000544.pdf
dc.identifier.urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245495
dc.description.abstractSolving resource-constrained (RC) project scheduling problems is one the most important tasks in the project planning process. This study presents a new hybrid approach, named Artificial Bee Colony with Differential Evolution, to handle resource-constrained problems (ABCDE-RC). The proposed algorithm integrates crossover operations from differential evolution (DE) with original artificial bee colony (ABC) to balance exploration and exploitation phases of the optimization process. Furthermore, this study applies a serial method to reflect individual-vector priorities into the active schedule to calculate project duration. The ABCDE-RC algorithm is compared with benchmark algorithms considered using a real construction case study and a set of standard problem available in the literature. The experimental results demonstrate the efficiency and effectiveness of the proposed model. The ABCDE-RC is a promising alternative approach to handling resource-constrained project scheduling problems.
dc.publisherAmerican Society of Civil Engineers
dc.titleSolving Resource-Constrained Project Scheduling Problems Using Hybrid Artificial Bee Colony with Differential Evolution
dc.typeJournal Paper
dc.journal.volume30
dc.journal.issue4
dc.journal.titleJournal of Computing in Civil Engineering
dc.identifier.doi10.1061/(ASCE)CP.1943-5487.0000544
dc.page04015065
dc.treeJournal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record