Show simple item record

dc.contributor.authorLi Wang
dc.contributor.authorFernanda Leite
dc.date.accessioned2017-12-30T13:05:04Z
dc.date.available2017-12-30T13:05:04Z
dc.date.issued2016
dc.identifier.other%28ASCE%29CP.1943-5487.0000484.pdf
dc.identifier.urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245454
dc.description.abstractIn recent years, building information modeling (BIM) has been increasingly applied in design coordination of mechanical, electrical, and plumbing (MEP) systems to enhance coordination and communication efficiency. While BIM has been mostly used to store and represent product information, process information such as discussions and decision made during design coordination is usually not properly captured. The research reported in this paper implements a previously developed knowledge representation schema to capture coordination information generated in the BIM-based design coordination process. A prototype system was developed for model-based knowledge capture and tested on a construction project. The proposed system indicates that process information can be captured and represented with direct links to the model, enabling model-based knowledge capture and further analysis of process information.
dc.publisherAmerican Society of Civil Engineers
dc.titleProcess Knowledge Capture in BIM-Based Mechanical, Electrical, and Plumbing Design Coordination Meetings
dc.typeJournal Paper
dc.journal.volume30
dc.journal.issue2
dc.journal.titleJournal of Computing in Civil Engineering
dc.identifier.doi10.1061/(ASCE)CP.1943-5487.0000484
dc.page04015017
dc.treeJournal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record