dc.description.abstractThis study evaluated the seismic performance of circular concrete-filled tube (CCFT) columns in accelerated bridge construction (ABC). In these projects, the bridge should be open to service after a couple of days. For this reason, this study evaluated the ability of CCFT columns to perform adequately under gravitational and seismic loading before the concrete reached its design strength at 28 days. A reduced seismic hazard that accounted for this temporal condition was implemented, and a performance evaluation was performed to obtain the CCFT column probability of failure. The performance of a CCFT column was compared with that of a circular reinforced concrete (RC) column of a Caltrans bridge. Probabilistic analyses using reduced seismic loads for the temporary condition indicated that CCFT columns with partial design concrete compressive strength can be used for ABC without resulting in an increased probability of failure.
dc.publisherAmerican Society of Civil Engineers
dc.titleEffects of Partial-Design-Strength Concrete on the Seismic Performance of Concrete-Filled Tube Columns in Accelerated Bridge Construction
dc.typeJournal Paper
dc.journal.volume21
dc.journal.issue6
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/(ASCE)BE.1943-5592.0000812
dc.page04016023
dc.treeJournal of Bridge Engineering:;2016:;Volume ( 021 ):;issue: 006
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record