Show simple item record

dc.contributor.authorNian Sheng Cheng
dc.contributor.authorYee Meng Chiew
dc.contributor.authorXingwei Chen
dc.date.accessioned2017-12-30T12:53:58Z
dc.date.available2017-12-30T12:53:58Z
dc.date.issued2016
dc.identifier.other%28ASCE%29EM.1943-7889.0001107.pdf
dc.identifier.urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243109
dc.description.abstractThis study presents a scaling analysis of the time development of clear-water scour depth at bridge piers. It shows that the widely-used exponential formula can be theoretically derived with scaling arguments. The derivation provides connections between the physical pier-scouring process and two empirical constants used in the formula. The dependence of the two constants on sediment coarseness is calibrated using published laboratory data with scour duration ranging from 49 to 1094 h. The analysis presented is restricted to conditions, including steady flow, clear-water scour, narrow circular cylindrical pier, and uniform sediment with low coarseness.
dc.publisherAmerican Society of Civil Engineers
dc.titleScaling Analysis of Pier-Scouring Processes
dc.typeJournal Paper
dc.journal.volume142
dc.journal.issue8
dc.journal.titleJournal of Engineering Mechanics
dc.identifier.doi10.1061/(ASCE)EM.1943-7889.0001107
dc.page06016005
dc.treeJournal of Engineering Mechanics:;2016:;Volume ( 142 ):;issue: 008
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record