• Login
    View Item 
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Development of Flood Inundation Maps and Quantification of Flood Risk in an Urban Catchment of Brahmaputra River

    Thumbnail
    View/Open
    AJRUA6.0000822.pdf (15.33Mb)
    Date
    2017
    Author
    Sanat Nalini Sahoo
    Pekkat Sreeja
    Metadata
    Show full item record
    Abstract
    Flood inundation mapping (FIM) is required to understand the affects of flooding in a particular area and on important structures such as roadways, railways, streets, buildings and airport. FIM provides important information, like depth and spatial extent of flooded zones, required by the municipal authorities to inform the citizens about the major flood prone areas and adopt appropriate flood management strategies. The present study demonstrates FIM as an effective tool in managing flooding in an urban catchment in northeast India and quantifies the flood risk with respect to different vulnerability parameters. The surface runoff has been estimated by a storm water management model (SWMM) and the drainage network of the study area has been used to find out the inundation pattern for peak rainfall intensities corresponding to different return periods. A flood hazard map has been developed on the basis of the possible flood hazard caused by the 100 year return period flood. The hazard ranks (HR) were developed by the interactive effect of vulnerability parameters such as flood depth and inundated area, land use, affected population, and roads. Based on the hazard ranks, flood risk zones were identified. The study demonstrates the utility of HR for identifying the worst flood-affected area along with the flood depth and durations. The details of this study can be used for planning flood preparedness in the worst affected areas.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4243001
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV