• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Centralized versus Distributed Cooperative Operating Rules for Multiple Cascaded Hydropower Reservoirs

    Thumbnail
    View/Open
    %28ASCE%29WR.1943-5452.0000685.pdf (2.291Mb)
    Date
    2016
    Author
    Xinyu Wu
    Chuntian Cheng
    Yun Zeng
    Jay R. Lund
    Metadata
    Show full item record
    Abstract
    Multiple cascaded hydropower reservoir systems serving the same area need to cooperate to increase overall benefits and reliability. To meet system demand while balancing among cascaded systems, both centralized and distributed five segment energy available based operating rules, making power decisions for subsystems and the whole system, are proposed for cooperation across multiple cascaded hydropower reservoirs. Unlike existing methods, the cooperative operating rules are optimized to the global objective of maximizing the minimum system power production, with constraints on local cascade minimum energy generation to confine the possible local profit earnings or losses because of cooperation, making the operating rules more acceptable for cooperative operations among local cascade system agents. The operating rule optimization models are solved using a genetic algorithm. A case study for three cascaded systems in southwest China shows that distributed and centralized cooperative operating rules can increase minimum total power by more than 3,600 MW and 4,700 MW, respectively, in the dry season with little energy changes in each cascaded system, taking advantages of reservoir storages and different timing of inflows. The centralized rule is superior to the distributed rule for increasing minimum power, although the distributed rule is more effective to control the energy for each cascaded system. The distributed and centralized rules adapt to higher subsystem energy constraints and higher interbasin compensation demands.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4242233
    Collections
    • Journal of Water Resources Planning and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV