• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Partially Earth-Anchored Cable Bridge: Ultralong-Span System Suitable for Carbon-Fiber-Reinforced Plastic Cables

    Thumbnail
    View/Open
    %28ASCE%29BE.1943-5592.0000877.pdf (1.728Mb)
    Date
    2016
    Author
    Zhibin Jin
    Shiling Pei
    Xing Wei
    Hongyan Liu
    Shizhong Qiang
    Metadata
    Show full item record
    Abstract
    As a new high-strength material, carbon-fiber-reinforced plastic (CFRP) cable provided an opportunity for bridge structures to achieve span limits that were not possible or economical in the past. Based on existing conceptual studies on ultralong-span bridges using CFRP, a new partially earth-anchored cable bridge (PEAC bridge) system was proposed in this study. The PEAC bridge system addresses existing challenges of applying CFRP to traditional suspension and cable-stayed bridge systems, while maintaining large spanning capacity. Through a detailed comparative study on traditional and proposed long-span systems, the performance of a PEAC bridge under static and dynamic loading was evaluated. The span limit of the PEAC bridge system was calculated based on the strength of material and cost considerations.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4241889
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV