Lifecycle Decision Framework for Steel Bridge Painting
Date
2017Author
Bismark R. D. K. Agbelie
Samuel Labi
Jon Fricker
Yu Qiao
Zhibo Zhang
Kumares C. Sinha
Metadata
Show full item recordAbstract
Bridge agencies seek to apply appropriate rehabilitation or maintenance treatments at the right time. For a specific treatment, improper timing can have significant adverse consequences: Premature application could mean wasteful spending by the agency even if road users and the community enjoy the benefits of a superior bridge condition, and deferred or delayed application can result in higher user or community disbenefits caused by poor condition and consequent reduced asset longevity in the long-term. For short-term decisions regarding the identification of the most cost-effective paint action at a specific time (do nothing, spot paint, overcoat, or recoat), the paper presents a methodology for developing a painting decision tree. For long-term decisions regarding the identification of the most cost-effective schedule over the superstructure lifetime, the paper demonstrates a methodology for developing a long-term schedule of painting activities. An analysis of the state of paint scheduling at a specific highway agency revealed that the current practice of complete recoating every 25 years may not be optimal. Instead, a painting schedule that includes the application of lower-level treatments (spot repairing and overcoating) can yield as much as a 19% reduction in the lifecycle cost and a 31.97% higher cost-effectiveness compared to the current practice.