• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Stackelberg-Nash Equilibrium for Integrated Gravelly Soil Excavation-Transportation-Distribution System in a Large-Scale Hydropower Construction Project

    Thumbnail
    View/Open
    %28ASCE%29CP.1943-5487.0000585.pdf (350.0Kb)
    Date
    2016
    Author
    Cuiying Feng
    Jiuping Xu
    Xin Yang
    Ziqiang Zeng
    Metadata
    Show full item record
    Abstract
    During the last few decades because of the increasing interactions between the supply chain entities, supply chain management research has matured. However, there has been limited research focused on construction supply chain problems. This paper presents an excavation-distribution problem with two-stage transportation for a two-echelon gravelly soil supply chain in a large-scale hydropower construction project. In this problem, Stackelberg game behavior is used to deal with the complex interactions exhibited between the decision entities in a fuzzy random uncertain environment, and bilevel programming is adopted to find the Stackelberg-Nash equilibrium solution. Further, a novel three-level programming Stackelberg model is developed to examine the dynamic game behavior and complex interactions between the entities and to determine the Stackelberg-Nash equilibrium solution for a gravelly soil two-echelon supply chain. To deal with the uncertainties, a hybrid crisp approach and an expected value operator are used to convert the fuzzy random parameters to definitive parameters. To solve this novel Stackelberg model, a hybrid algorithm combined with interactive fuzzy programming techniques and two types of evolved particle swarm optimization algorithms are designed. The results and an analysis of a practical example at a large-scale hydropower project demonstrate the practicality and efficiency of the proposed model and optimization method.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4241093
    Collections
    • Journal of Computing in Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV