• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Multidimensional Data and Model Uncertainties in Comparing Heterogeneous Benefits of Distributed Transportation Projects

    Thumbnail
    View/Open
    %28ASCE%29IS.1943-555X.0000274.pdf (1.104Mb)
    Date
    2016
    Author
    James H. Lambert
    Nilesh N. Joshi
    Shital A. Thekdi
    Metadata
    Show full item record
    Abstract
    Investments in transportation projects are typically justified by diverse potential benefits, including safety, environmental, energy savings, congestion mitigation, and others. There is a need for such benefits to be comparable early in transportation programming, to allocate scarce resources to preliminary engineering. This paper discusses quantitative methods to aid in prioritizing locations of future highway projects. The paper adopts 15 quantitative metrics including crash rate, emergency route access, environmental issues, level of service (LOS), volume-to-capacity ratio, traffic flow, intermodal access, heavy truck usage, unemployment rate, right-of-way use, use of alternative transportation modes, bridge sufficiency rating, and cost effectiveness. This effort contributes to real-world transportation programming and priority setting via analysis of the crash avoidance and other benefits and costs that are expected before project designs are available. The innovation of this paper is in two areas: (1) estimation of broad-spectrum benefits across several categories including crashes avoided, travel time saved, fuel uses avoided, and emissions avoided; and (2) development of a software tool that compares project benefits to prefeasibility estimates of project costs. The developed software represents the uncertainty of the results using numerical intervals. The paper illustrates how project selection is informed with sparse and/or early information on a large number of potential locations and needs. With interval analysis of uncertainty, decision makers might conclude that existing evidence is sufficient to distinguish among competing needs. The methods are demonstrated for 53 project locations ranging in their prefeasibility cost estimates from $2 million to $130 million.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4238533
    Collections
    • Journal of Infrastructure Systems

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV