Show simple item record

dc.contributor.authorYang Li
dc.contributor.authorJiang-long Wang
dc.contributor.authorSu-su Ge
dc.date.accessioned2017-12-16T09:00:58Z
dc.date.available2017-12-16T09:00:58Z
dc.date.issued2017
dc.identifier.otherJHTRCQ.0000549.pdf
dc.identifier.urihttp://138.201.223.254:8080/yetl1/handle/yetl/4237441
dc.description.abstractIterative initial value of cable force based on influence matrix and linear programming is determined in order to study the cable force of long-span concrete-filled steel tube (CFST) arch bridge using the cable-hoisting construction method. Considering the effect of tangential displacement, we observed the appropriate cable force through the golden selection method and iterative forward erection. The cable force determination flow and method aimed at the installation shape are analyzed, which shows that the one-off tension of the cable force on a cable-hoisting CFST arch bridge focusing on installation shape is achieved and serves as a reference for similar engineering practices.
dc.publisherAmerican Society of Civil Engineers
dc.titleOptimum Calculation Method for Cable Force of Concrete-Filled Steel Tube Arch Bridge in Inclined Cable-Stayed Construction
dc.typeJournal Paper
dc.journal.volume11
dc.journal.issue1
dc.journal.titleJournal of Highway and Transportation Research and Development (English Edition)
dc.identifier.doi10.1061/JHTRCQ.0000549
dc.treeJournal of Highway and Transportation Research and Development (English Edition ):;2017:;Volume ( 011 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record