• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    An Efficient Workflow for Production Allocation During Water Flooding

    Thumbnail
    View/Open
    jert_139_03_032902.pdf (1.478Mb)
    Date
    2017
    Author
    Azamipour, Vahid
    Assareh, Mehdi
    Dehghani, Mohammad Reza
    Mittermeir, Georg M.
    Metadata
    Show full item record
    Abstract
    This paper presents an efficient production optimization scheme for an oil reservoir undergoing water injection by optimizing the production rate for each well. In this approach, an adaptive version of simulated annealing (ASA) is used in two steps. The optimization variables updating in the first stage is associated with a coarse grid model. In the second step, the fine grid model is used to provide more details in final solution search. The proposed method is formulated as a constrained optimization problem defining a desired objective function and a set of existing field/facility constraints. The use of polytope in the ASA ensures the best solution in each iteration. The objective function is based on net present value (NPV). The initial oil production rates for each well come from capacity and property of each well. The coarse grid block model is generated based on average horizon permeability. The proposed optimization workflow was implemented for a field sector model. The results showed that the improved rates optimize the total oil production. The optimization of oil production rates and total water injection rate leads to increase in the total oil production from 315.616 MSm3 (our initial guess) to 440.184 MSm3, and the recovery factor is increased to 26.37%; however, the initial rates are much higher than the optimized rates. Beside this, the recovery factor of optimized production schedule with optimized total injection rate is 3.26% larger than the initial production schedule with optimized total water injection rate.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4236934
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV