• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Electrochemical Energy Conversion and Storage
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Electrochemical Energy Conversion and Storage
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Cost Requirements for a Small-Scale SOFC Fed From Agricultural-Derived Biogas

    Thumbnail
    View/Open
    jeecs_014_01_011002.pdf (1.048Mb)
    Date
    2017
    Author
    Majerus, Samuel
    Lauinger, Dirk
    Van herle, Jan
    Metadata
    Show full item record
    Abstract
    In this work, the use of fuel cells for valorizing agricultural-derived biogas in Switzerland is studied. The Swiss agricultural case is characterized by farms with small numbers of animals (20 cows) and high feed-in tariffs (FIT) for biogas-derived electricity (0.49 CHF/kWhel). Thus, small-scale biogas installations are reviewed and the possibility to couple them with solid oxide fuel cells (SOFCs) and photovoltaic (PV) panels is analyzed. To date, less than 5% of the Swiss agricultural biogas potential is used. It is possible to increase this value significantly up to 86% through the deployment of 2 kWel engines. The small size of the Swiss farm requires biogas installations in the kW-range. Small-scale biogas facilities are not profitable yet: the main challenge is to bring down the lifetime cost of the fuel cells to 11,000 CHF/kWel (considering a lifetime of ten years) and to reduce the investment cost (IC) of small-scale biogas facilities to around 9500 CHF/kWch. In the kW-range, solid oxide fuel cells (SOFCs) have higher electrical conversion efficiencies than internal combustion engines (ICEs). It is shown that SOFCs become competitive over combustion engines if the investment cost of the former decreases below 13,000 CHF/kWel for a lifetime of 11 years. Combining the biogas facility with a PV-battery system, which covers the digester's electricity needs, is found to be beneficial. A considerable reduction in the feed-in tariffs would make small- to medium-scale biogas installations unprofitable, at current cost. In order to reach a break-even under these conditions, the investment cost of the biogas plant needs to drop below 4000 CHF/kWch, whereas the investment cost of the SOFC needs to drop below 3400 CHF/kWel.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4236789
    Collections
    • Journal of Electrochemical Energy Conversion and Storage

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV