• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Offshore Mechanics and Arctic Engineering
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Offshore Mechanics and Arctic Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Experimental Study on Installation of Composite Bucket Foundations for Offshore Wind Turbines in Silty Sand

    Thumbnail
    View/Open
    omae_138_06_061901.pdf (3.583Mb)
    Date
    2016
    Author
    Zhang, Puyang
    Zhang, Zhi
    Liu, Yonggang
    Ding, Hongyan
    Metadata
    Show full item record
    Abstract
    The composite bucket foundation (CBF) is a cost-competitive foundation for offshore wind turbines, which can be adapted to the loading characteristics and development needs of offshore wind farms due to its special structural form. There are seven sections divided inside the CBF by steel bulkheads, which are arranged in a honeycomb structure. The six peripheral sections with the skirt have the same proportions while the middle orthohexagonal one is a little larger. With the seven-section structure, the CBF has reasonable motion characteristics and towing reliability during the wet-tow construction process. Moreover, the pressure inside the compartments can control the levelness of the CBF during suction installation. Several large-scale model tests on suction installation of CBF have been performed in order to explore the feasibility of the tilt adjusting technique in saturated silty sand off the coast of Jiangsu in China. The composite bucket foundation in the tests has an outer diameter of 3.5 m and a clear wall height of 0.9 m. During the suction-assisted penetration process, the pressures in all the compartments were controlled to level the foundation in a timely operation. A convenient method is to improve the CBF inclination by controlling the inside differential pressure among the compartments. It can be commonly carried out by applying suction/positive pressure with intermittent pumping among the seven compartments. Another adjusting technique for a big tilt with deeper penetration is operated with decreasing the penetration depth achieved by suction-assisted lowering the relatively high compartments and positive pressures raising the relatively low compartments. Test results show that the reciprocating adjustment process can be repeated until the CBF is completely penetrated into a designed depth.
    URI
    http://138.201.223.254:8080/yetl1/handle/yetl/4235426
    Collections
    • Journal of Offshore Mechanics and Arctic Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV