• Login
    View Item 
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Ensemble Forecast Uncertainty of the 1 December 2011 Wasatch Windstorm

    Thumbnail
    View/Open
    ams-88125.pdf (3.955Mb)
    Date
    2015
    Author
    Lawson, John
    Horel, John
    Metadata
    Show full item record
    Abstract
    downslope windstorm on 1 December 2011 led to considerable damage along a narrow 50-km swath at the western base of the Wasatch Mountains in northern Utah. Operational forecasts issued by the Salt Lake City National Weather Service Forecast Office provided accurate guidance for the event at 1?2-day lead times, partially based on locally generated high-resolution numerical forecasts. Forecasters highlighted the possibility of the windstorm 4 days in advance. To address the apparent reduced uncertainty for this windstorm, three 11-member three-domain ensemble forecasts were initialized at 0000 UTC 25 November, 0000 UTC 27 November, and 0000 UTC 29 November 2011 using the Weather Research and Forecasting (WRF) Model with initial and boundary conditions supplied by Global Ensemble Forecast System Reforecast, version 2 (GEFS/R2). Eight of the 11 ensemble members from the 29 November 2011 forecast (60 h before the windstorm) generated a strong, localized windstorm with outliers arising from reduced cross-barrier flow. Analysis of kinetic energy error growth suggests that the reduced uncertainty of 60-h forecasts was not primarily a result of the underdispersion of GEFS/R2 initial and boundary conditions but was related to a regional reduction in error growth in midtropospheric flow upstream of northern Utah. The ensemble initialized 2 days earlier (27 November, 108 h before the windstorm) contains fewer members that generate strong windstorms, while no members generate a windstorm in the ensemble initialized on 25 November (156 h prior). This sudden increase in uncertainty with forecast lead time results from the sensitivity of the ensemble solutions to the lateral boundary conditions imposed by the GEFS/R2 between 0000 UTC 29 November and 0000 UTC 30 November.
    URI
    http://onlinelibrary.yabesh.ir/handle/yetl/4231871
    Collections
    • Weather and Forecasting

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV