• Login
    View Item 
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Verification of Surface Temperature Forecasts from the National Digital Forecast Database over the Western United States

    Thumbnail
    View/Open
    ams-87634.pdf (4.527Mb)
    Date
    2006
    Author
    Myrick, David T.
    Horel, John D.
    Metadata
    Show full item record
    Abstract
    Experimental gridded forecasts of surface temperature issued by National Weather Service offices in the western United States during the 2003/04 winter season (18 November 2003?29 February 2004) are evaluated relative to surface observations and gridded analyses. The 5-km horizontal resolution gridded forecasts issued at 0000 UTC for forecast lead times at 12-h intervals from 12 to 168 h were obtained from the National Digital Forecast Database (NDFD). Forecast accuracy and skill are determined relative to observations at over 3000 locations archived by MesoWest. Forecast quality is also determined relative to Rapid Update Cycle (RUC) analyses at 20-km resolution that are interpolated to the 5-km NDFD grid as well as objective analyses obtained from the Advanced Regional Prediction System Data Assimilation System that rely upon the MesoWest observations and RUC analyses. For the West as a whole, the experimental temperature forecasts issued at 0000 UTC during the 2003/04 winter season exhibit skill at lead times of 12, 24, 36, and 48 h on the basis of several verification approaches. Subgrid-scale temperature variations and observational and analysis errors undoubtedly contribute some uncertainty regarding these results. Even though the ?true? values appropriate to evaluate the forecast values on the NDFD grid are unknown, it is estimated that the root-mean-square errors of the NDFD temperature forecasts are on the order of 3°C at lead times shorter than 48 h and greater than 4°C at lead times longer than 120 h. However, such estimates are derived from only a small fraction of the NDFD grid boxes. Incremental improvements in forecast accuracy as a result of forecaster adjustments to the 0000 UTC temperature grids from 144- to 24-h lead times are estimated to be on the order of 13%.
    URI
    http://onlinelibrary.yabesh.ir/handle/yetl/4231325
    Collections
    • Weather and Forecasting

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV