• Login
    View Item 
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Warm Season Lightning Probability Prediction for Canada and the Northern United States

    Thumbnail
    View/Open
    ams-87580.pdf (2.502Mb)
    Date
    2005
    Author
    Burrows, William R.
    Price, Colin
    Wilson, Laurence J.
    Metadata
    Show full item record
    Abstract
    Statistical models valid May?September were developed to predict the probability of lightning in 3-h intervals using observations from the North American Lightning Detection Network and predictors derived from Global Environmental Multiscale (GEM) model output at the Canadian Meteorological Centre. Models were built with pooled data from the years 2000?01 using tree-structured regression. Error reduction by most models was about 0.4?0.7 of initial predictand variance. Many predictors were required to model lightning occurrence for this large area. Highest ranked overall were the Showalter index, mean sea level pressure, and troposphere precipitable water. Three-hour changes of 500-hPa geopotential height, 500?1000-hPa thickness, and MSL pressure were highly ranked in most areas. The 3-h average of most predictors was more important than the mean or maximum (minimum where appropriate). Several predictors outranked CAPE, indicating it must appear with other predictors for successful statistical lightning prediction models. Results presented herein demonstrate that tree-structured regression is a viable method for building statistical models to forecast lightning probability. Real-time forecasts in 3-h intervals to 45?48 h were made in 2003 and 2004. The 2003 verification suggests a hybrid forecast based on a mixture of maximum and mean forecast probabilities in a radius around a grid point and on monthly climatology will improve accuracy. The 2004 verification shows that the hybrid forecasts had positive skill with respect to a reference forecast and performed better than forecasts defined by either the mean or maximum probability at most times. This was achieved even though an increase of resolution and change of convective parameterization scheme were made to the GEM model in May 2004.
    URI
    http://onlinelibrary.yabesh.ir/handle/yetl/4231264
    Collections
    • Weather and Forecasting

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV