dc.contributor.authorMcQuigg, James D.
dc.contributor.authorDecker, Wayne L.
dc.date.accessioned2017-06-09T16:28:18Z
dc.date.available2017-06-09T16:28:18Z
dc.date.copyright1962/06/01
dc.date.issued1962
dc.identifier.issn0021-8952
dc.identifier.otherams-6847.pdf
dc.identifier.urihttp://onlinelibrary.yabesh.ir/handle/yetl/4210033
dc.description.abstractIf an outdoor job were being planned in an area which never received precipitation, all facilities could be scheduled with assurance that work could proceed to completion without interruption because of precipitation. In practice, many an outdoor job has been scheduled, only to be delayed several times before actual completion. It would be useful to be able to estimate the probability of completing a job as scheduled. A mathematical model is developed which includes: (1) A scheduled beginning date, (2) An amount of precipitation in one day that would interrupt a job, (3) The number of days of ?drying out? time required, (4) The number of work days required. For a particular place and job, the problem is to estimate the probability that a run of dry days will occur during a particular period of time. This could be estimated by counting runs in a sample period, or computed by several methods. In this study probabilities were computed by an approximation technique which yielded estimates comparable to those from counts of actual runs. Probability estimates for different beginning dates and lengths of drying and work periods are presented.
dc.publisherAmerican Meteorological Society
dc.titleThe Probability of Completion of Outdoor Work
dc.typeJournal Paper
dc.journal.volume1
dc.journal.issue2
dc.journal.titleJournal of Applied Meteorology
dc.identifier.doi10.1175/1520-0450(1962)001<0178:TPOCOO>2.0.CO;2
dc.journal.fristpage178
dc.journal.lastpage183
dc.treeJournal of Applied Meteorology:;1962:;volume( 001 ):;issue: 002