Show simple item record

dc.contributor.authorArcher, Cristina L.
dc.contributor.authorJacobson, Mark Z.
dc.date.accessioned2017-06-09T16:18:04Z
dc.date.available2017-06-09T16:18:04Z
dc.date.copyright2007/11/01
dc.date.issued2007
dc.identifier.issn1558-8424
dc.identifier.otherams-65307.pdf
dc.identifier.urihttp://onlinelibrary.yabesh.ir/handle/yetl/4206518
dc.description.abstractWind is the world?s fastest growing electric energy source. Because it is intermittent, though, wind is not used to supply baseload electric power today. Interconnecting wind farms through the transmission grid is a simple and effective way of reducing deliverable wind power swings caused by wind intermittency. As more farms are interconnected in an array, wind speed correlation among sites decreases and so does the probability that all sites experience the same wind regime at the same time. The array consequently behaves more and more similarly to a single farm with steady wind speed and thus steady deliverable wind power. In this study, benefits of interconnecting wind farms were evaluated for 19 sites, located in the midwestern United States, with annual average wind speeds at 80 m above ground, the hub height of modern wind turbines, greater than 6.9 m s?1 (class 3 or greater). It was found that an average of 33% and a maximum of 47% of yearly averaged wind power from interconnected farms can be used as reliable, baseload electric power. Equally significant, interconnecting multiple wind farms to a common point and then connecting that point to a far-away city can allow the long-distance portion of transmission capacity to be reduced, for example, by 20% with only a 1.6% loss of energy. Although most parameters, such as intermittency, improved less than linearly as the number of interconnected sites increased, no saturation of the benefits was found. Thus, the benefits of interconnection continue to increase with more and more interconnected sites.
dc.publisherAmerican Meteorological Society
dc.titleSupplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms
dc.typeJournal Paper
dc.journal.volume46
dc.journal.issue11
dc.journal.titleJournal of Applied Meteorology and Climatology
dc.identifier.doi10.1175/2007JAMC1538.1
dc.journal.fristpage1701
dc.journal.lastpage1717
dc.treeJournal of Applied Meteorology and Climatology:;2007:;volume( 046 ):;issue: 011
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record