Show simple item record

dc.contributor.authorColby, Frank P.
dc.date.accessioned2017-06-09T14:54:42Z
dc.date.available2017-06-09T14:54:42Z
dc.date.copyright1998/03/01
dc.date.issued1998
dc.identifier.issn0882-8156
dc.identifier.otherams-2949.pdf
dc.identifier.urihttp://onlinelibrary.yabesh.ir/handle/yetl/4166722
dc.description.abstractTemperatures taken from model output (FOUS reports) routinely transmitted by the National Centers for Environmental Prediction are tabulated to determine errors during three months in the summer of 1996. These short-term model forecasts are compared to the models? own initialization over three 1-month periods. The results suggest that the Eta Model consistently forecasted low-level temperatures that were too warm, while the Nested Grid Model consistently forecasted low-level temperatures that were slightly too cold. This paper shows some of these statistics, along with a case example in which the models made very large errors (greater than 10°C). A check of recent model output indicates that changes made recently to the Eta Model have reduced much of the bias found in the summer of 1996. A recent case example shows, however, that large short-term forecast errors still occur, even with the updated Eta Model.
dc.publisherAmerican Meteorological Society
dc.titleA Preliminary Investigation of Temperature Errors in Operational Forecasting Models
dc.typeJournal Paper
dc.journal.volume13
dc.journal.issue1
dc.journal.titleWeather and Forecasting
dc.identifier.doi10.1175/1520-0434(1998)013<0187:APIOTE>2.0.CO;2
dc.journal.fristpage187
dc.journal.lastpage205
dc.treeWeather and Forecasting:;1998:;volume( 013 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail
This item appears in the following Collection(s)

Show simple item record