| dc.contributor.author | Lijun Zhu | |
| dc.contributor.author | Jianzhong Wang | |
| dc.contributor.author | Nian-Sheng Cheng | |
| dc.contributor.author | Qiang Ying | |
| dc.contributor.author | Daifeng Zhang | |
| dc.date.accessioned | 2017-05-08T21:10:29Z | |
| dc.date.available | 2017-05-08T21:10:29Z | |
| dc.date.copyright | March 2004 | |
| dc.date.issued | 2004 | |
| dc.identifier.other | %28asce%290733-950x%282004%29130%3A2%2898%29.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/41520 | |
| dc.description.abstract | This study is concerned with two hydrodynamic parameters that are essential for the construction of submerged dikes in rivers with sand-filled geosynthetic bags. First, laboratory study and field observation are conducted to investigate the horizontal settling distance of sandbags in open channel flows. Sandbag models used for laboratory tests are prepared according to similarity requirements. An analytical formula for evaluating the settling distance is then derived based on the experimental data. The predictions are then compared to the field measurements. The observed settling distance varies significantly and its probability density distribution is positively skewed. This study also presents a formula for computing the critical flow velocity at incipient sandbag motion for two extreme conditions. | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Settling Distance and Incipient Motion of Sandbags in Open Channel Flows | |
| dc.type | Journal Paper | |
| dc.journal.volume | 130 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Journal of Waterway, Port, Coastal, and Ocean Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)0733-950X(2004)130:2(98) | |
| dc.tree | Journal of Waterway, Port, Coastal, and Ocean Engineering:;2004:;Volume ( 130 ):;issue: 002 | |
| dc.contenttype | Fulltext | |