Show simple item record

dc.contributor.authorKevin E. Lansey
dc.contributor.authorHarikumar Menon
dc.date.accessioned2017-05-08T21:09:42Z
dc.date.available2017-05-08T21:09:42Z
dc.date.copyrightMay 1993
dc.date.issued1993
dc.identifier.other%28asce%290733-950x%281993%29119%3A3%28289%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/40996
dc.description.abstractChannel maintenance dredging is a significant investment, and techniques to improve the decision process are needed. A methodology for determining the least cost schedule for inspecting and dredging a single channel reach is presented in this paper. The methodology determines a control‐limit rule, which minimizes the expected cost of maintaining the reach. The approach accounts for the uncertainties in the shoaling rate and in the streamflow. All applicable costs are included in determining the best policy, including the unit dredging cost, mobilization and demobilization cost, and the expected failure cost. A fast‐solution algorithm using a policy‐iteration scheme allows a range of conditions and sensitivities to be analyzed. The model will be useful for comparison with present maintenance strategies and for examining the potential of advanced maintenance dredging. An application example is shown to demonstrate the model, its results, and costs, which may significantly affect the decision process.
dc.publisherAmerican Society of Civil Engineers
dc.titleOptimal Risk‐Based Inspection and Dredging Scheduling for Independent Dredge Reaches
dc.typeJournal Paper
dc.journal.volume119
dc.journal.issue3
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)0733-950X(1993)119:3(289)
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;1993:;Volume ( 119 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record