Show simple item record

dc.contributor.authorJay R. Lund
dc.date.accessioned2017-05-08T21:09:25Z
dc.date.available2017-05-08T21:09:25Z
dc.date.copyrightMarch 1990
dc.date.issued1990
dc.identifier.other%28asce%290733-950x%281990%29116%3A2%28211%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/40799
dc.description.abstractNew methods are suggested for scheduling advance maintenance dredging on isolated reaches of navigation channels based on economic and reliability analysis. For reaches where sedimentation occurs regularly as a result of gradual slumping, quiescent deposition, or regular erosion due to waves and wakes, the problem reduces to a deterministic least‐cost replacement problem. Where sedimentation rates are uncertain, the risk of sediment encroachment into the navigational channel becomes a concern. Where sedimentation rates are probabilistic and independently distributed in time, encroachment probabilities and expected dredging costs can be calculated for a variety of dredging schedules. This risk and cost analysis allows explicit specification of risk‐cost trade‐offs in dredge scheduling. These methods are applied to an example case where existing dredging costs are compared with those estimated using these new dredge scheduling techniques. Extensions of these methods could be applied to multiple‐reach dredge scheduling, sizing sediment traps, and scheduling dredging with explicit consideration of environmental impacts.
dc.publisherAmerican Society of Civil Engineers
dc.titleScheduling Maintenance Dredging on Single Reach with Uncertainty
dc.typeJournal Paper
dc.journal.volume116
dc.journal.issue2
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)0733-950X(1990)116:2(211)
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;1990:;Volume ( 116 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record