Show simple item record

dc.contributor.authorD. J. Hagerty
dc.contributor.authorR. A. Linker
dc.contributor.authorD. A. Beatty
dc.date.accessioned2017-05-08T21:09:19Z
dc.date.available2017-05-08T21:09:19Z
dc.date.copyrightMay 1989
dc.date.issued1989
dc.identifier.other%28asce%290733-950x%281989%29115%3A3%28399%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/40740
dc.description.abstractA study was conducted between 1978 and 1984 in a 72 mile-long stretch of the Ohio River to detect the influence of construction of the Smithland Locks and Dam on bank instability. Changes in bank appearance were noted during four inspections made before dam construction and pool raise, and during two inspections made after pool raise. The navigation dam raised river pool levels as much as 22 feet. During inspections, the entire extent of the stream affected by the navigation dam was evaluated. Banks were classified (high-eroded, low-eroded, vegetated, etc.). Correlations of erosion classification with magnitude of pool raise, planform location, and other factors were attempted. This work extended previous site-specific erosion evaluations and studies in other reaches of river. This was the first before dam-after dam study of bank erosion, of this kind, ever published. It was found that raising the navigation pool in 1981, had no effect on riverbank appearance and apparent erosion between 1978 and 1984.
dc.publisherAmerican Society of Civil Engineers
dc.titleEvaluation of Navigation Dam Effects on Riverbanks
dc.typeJournal Paper
dc.journal.volume115
dc.journal.issue3
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)0733-950X(1989)115:3(399)
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;1989:;Volume ( 115 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record