Show simple item record

dc.contributor.authorBilly H. Johnson
dc.contributor.authorMichael J. Trawle
dc.contributor.authorSteve A. Adamec, Jr.
dc.date.accessioned2017-05-08T21:09:13Z
dc.date.available2017-05-08T21:09:13Z
dc.date.copyrightNovember 1988
dc.date.issued1988
dc.identifier.other%28asce%290733-950x%281988%29114%3A6%28700%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/40699
dc.description.abstractResults from a series of numerical model runs predicting the shortterm physical fate of dredged material disposed in the open water of Puget Sound are presented along with a discussion of the numerical model applied. The first set of results is from a generic study covering a wide range of water depths and ambient currents. The range of conditions tested is intended to represent typical ambient conditions and material to be disposed in Puget Sound. The second set of results is from a study concerning the modeling of the fate of material to be dredged at the proposed U.S. Navy Home Port in Everett, Washington. Current plans call for disposal of the material at a site located in 81 m of water in Puget Sound. The approach under study is to dispose of the contaminated material from a bottomdumping barge to be capped by the following disposal of uncontaminated material from a surface pipeline with an attached splash plate to minimize the bottom impact of the capping material.
dc.publisherAmerican Society of Civil Engineers
dc.titleDredged Material Disposal Modeling in Puget Sound
dc.typeJournal Paper
dc.journal.volume114
dc.journal.issue6
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)0733-950X(1988)114:6(700)
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;1988:;Volume ( 114 ):;issue: 006
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record