| dc.contributor.author | Orson P. Smith | |
| dc.date.accessioned | 2017-05-08T21:09:07Z | |
| dc.date.available | 2017-05-08T21:09:07Z | |
| dc.date.copyright | September 1987 | |
| dc.date.issued | 1987 | |
| dc.identifier.other | %28asce%290733-950x%281987%29113%3A5%28447%29.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/40607 | |
| dc.description.abstract | The cost‐effective optimization of rubble‐mound breakwater cross sections requires a summation of all the life cycle costs for each alternative design, including construction costs, maintenance costs and associated economic losses due to wave attack. A systematic procedure is proposed for estimating the economic losses with and without breakwater protection along with the first and maintenance costs for a set of alternatives with varying functional performance and structural integrity design criteria. | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Cost‐Effectiveness of Breakwater Cross Sections | |
| dc.type | Journal Paper | |
| dc.journal.volume | 113 | |
| dc.journal.issue | 5 | |
| dc.journal.title | Journal of Waterway, Port, Coastal, and Ocean Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)0733-950X(1987)113:5(447) | |
| dc.tree | Journal of Waterway, Port, Coastal, and Ocean Engineering:;1987:;Volume ( 113 ):;issue: 005 | |
| dc.contenttype | Fulltext | |