Show simple item record

dc.contributor.authorRichard Silvester
dc.date.accessioned2017-05-08T21:09:00Z
dc.date.available2017-05-08T21:09:00Z
dc.date.copyrightJanuary 1986
dc.date.issued1986
dc.identifier.other%28asce%290733-950x%281986%29112%3A1%2895%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/40516
dc.description.abstractAn alternative to rubble mound construction, with or without precast concrete armor units, is recommended which comprises flexible membranes filled with cement mortar in situ. The placement of these for greatest stability is suggested by maximizing surface contact of sausage type units. Results of tests to derive an economical mortar mix are described. Construction details are outlined together with comparative costs for a marina breakwater.
dc.publisherAmerican Society of Civil Engineers
dc.titleUse of Grout‐Filled Sausages in Coastal Structures
dc.typeJournal Paper
dc.journal.volume112
dc.journal.issue1
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)0733-950X(1986)112:1(95)
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;1986:;Volume ( 112 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record