Show simple item record

dc.contributor.authorAshish Verma
dc.contributor.authorS. L. Dhingra
dc.date.accessioned2017-05-08T21:05:49Z
dc.date.available2017-05-08T21:05:49Z
dc.date.copyrightSeptember 2006
dc.date.issued2006
dc.identifier.other%28asce%290733-9488%282006%29132%3A3%28138%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/38513
dc.description.abstractThis paper discusses a model for developing optimal integrated schedules for urban rail and feeder bus operation. It consists of two parts: train scheduling submodel and schedule coordination submodel, which are formulated as combinatorial type optimization problems. The objective function for train scheduling submodel is fixed as minimization of sum of operating cost of trains (operator cost) and total waiting time cost of passengers boarding the train (user costs) subject to load factor and waiting time constraint, whereas the objective function for schedule coordination submodel is fixed as minimization of sum of total operating cost of feeder buses (operator cost), total transfer time cost for passengers transferring from train to feeder buses, and total waiting time cost of passengers boarding enroute (user costs) subject to load factor and transfer time constraint. The coordination is done for two cases: Case 1 for
dc.publisherAmerican Society of Civil Engineers
dc.titleDeveloping Integrated Schedules for Urban Rail and Feeder Bus Operation
dc.typeJournal Paper
dc.journal.volume132
dc.journal.issue3
dc.journal.titleJournal of Urban Planning and Development
dc.identifier.doi10.1061/(ASCE)0733-9488(2006)132:3(138)
dc.treeJournal of Urban Planning and Development:;2006:;Volume ( 132 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record