Show simple item record

dc.contributor.authorJinghui Zheng
dc.contributor.authorHassan Nanbakhsh
dc.contributor.authorMiklas Scholz
dc.date.accessioned2017-05-08T21:05:48Z
dc.date.available2017-05-08T21:05:48Z
dc.date.copyrightMarch 2006
dc.date.issued2006
dc.identifier.other%28asce%290733-9488%282006%29132%3A1%2836%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/38496
dc.description.abstractCombined wetlands and infiltration ponds are cost-effective ‘end of pipe’ drainage solutions that can be applied for local source control as part of urban development and regeneration. The aims of this case study were to assess constraints associated with the planning, design, and operation of these ponds, the influence of aquatic plants on infiltration rates, and the water treatment potential. Storm runoff was first stored and treated in a constructed wetland before it overflowed into parallel infiltration ponds of which one was planted and the other one was unplanted. Three international best management practice design guidelines failed in practice. The presence of macrophytes in one infiltration pond had no significant influence on the drainage properties. The water quality of both ponds was not acceptable for water reuse directly after the system setup. Filamentous green algae within the unplanted pond were blooming in spring and summer creating an aesthetically unpleasing pond surface area. After
dc.publisherAmerican Society of Civil Engineers
dc.titleCase Study: Design and Operation of Sustainable Urban Infiltration Ponds Treating Storm Runoff
dc.typeJournal Paper
dc.journal.volume132
dc.journal.issue1
dc.journal.titleJournal of Urban Planning and Development
dc.identifier.doi10.1061/(ASCE)0733-9488(2006)132:1(36)
dc.treeJournal of Urban Planning and Development:;2006:;Volume ( 132 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record