| dc.contributor.author | Taejin Kim | |
| dc.contributor.author | Božidar Stojadinović | |
| dc.contributor.author | Andrew S. Whittaker | |
| dc.date.accessioned | 2017-05-08T21:00:28Z | |
| dc.date.available | 2017-05-08T21:00:28Z | |
| dc.date.copyright | February 2008 | |
| dc.date.issued | 2008 | |
| dc.identifier.other | %28asce%290733-9445%282008%29134%3A2%28289%29.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/35183 | |
| dc.description.abstract | Results of experimental and analytical investigations of the seismic response of fully restrained steel moment connections between deep W-shape beams and deep and square built-up box columns are presented. Prototype beam-column connections were selected from the steel moment-resisting frames in a building built before the 1994 Northridge earthquake. Two full-size, single sided, pre-Northridge box column connection assemblage specimens were fabricated using the prototype connection data. Pretest analyses showed that the responses of box column connections can be substantially different from W-shape column connections. Both specimens were tested using a standard connection prequalification test protocol and each failed by brittle fracture in the complete joint penetration (CJP) welds of the beam flanges at connection drift angles less than | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Seismic Performance of Pre-Northridge Welded Steel Moment Connections to Built-Up Box Columns | |
| dc.type | Journal Paper | |
| dc.journal.volume | 134 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Journal of Structural Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)0733-9445(2008)134:2(289) | |
| dc.tree | Journal of Structural Engineering:;2008:;Volume ( 134 ):;issue: 002 | |
| dc.contenttype | Fulltext | |