Show simple item record

dc.contributor.authorReza Lashgari, Hamid
dc.contributor.authorHanaei, Amir
dc.contributor.authorAdeli, A. R.
dc.date.accessioned2017-05-09T01:11:56Z
dc.date.available2017-05-09T01:11:56Z
dc.date.issued2014
dc.identifier.issn0094-9930
dc.identifier.otherpvt_136_02_025501.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/156130
dc.description.abstractRiskbased inspection program (RBI) is a decision making techniques for providing refineries and petrochemical plants with an effective and appropriate inspection planning. The aim of the present study is to analyze failure behavior and risk ranking of خ±MDEA fin/fan cooler of CO2 removal unit based on API 581 in order to find out the reason(s) of tubes failure. According to previous experience in similar plant, risk calculation results and conducted inspection activity by using RFT eddy current technique, CO2 corrosion damage mechanism was identified as a main reason of tubes failure. In next step, process key variable, prevention/mitigation methods and inspection planning programs were determined so as to minimize the similar failure behavior in the rest of the lean amine aircooled heat exchangers of CO2 removal unit.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleFailure Analysis of خ± MDEA Air Cooled Heat Exchanger of CO2 Removal Unit Based on the Semiquantitative Risk Based Inspection Method
dc.typeJournal Paper
dc.journal.volume136
dc.journal.issue2
dc.journal.titleJournal of Pressure Vessel Technology
dc.identifier.doi10.1115/1.4025783
dc.journal.fristpage25501
dc.journal.lastpage25501
dc.identifier.eissn1528-8978
dc.treeJournal of Pressure Vessel Technology:;2014:;volume( 136 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record