• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Effective Method to Predict Installation of Plunger in a Gas Well

    Thumbnail
    View/Open
    jert_136_02_024501.pdf (865.4Kb)
    Date
    2014
    Author
    Luo, Shu
    Kelkar, Mohan
    Metadata
    Show full item record
    Abstract
    Liquid loading is a common problem for most of the mature gas wells. Over years, many methods have been developed to solve this problem. One of the widely used methods is plunger lift, which requires shutin of the gas well for a period of time. Then, the well is reopened, and it is expected that the natural energy of the well will push the plunger to the surface carrying the liquid with it. Optimization of the plunger lift requires that the well be shutin for a period of time as short as possible, followed by production of gas for as long as possible. This note examines the requirement for a successful shutin of a well so that the well can sustain the production for a longer time. The note also discusses the condition under which the well will not sustain the production and the plunger lift will not be effective. The analysis is confirmed with several field examples, which will be shown in this note.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/154559
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV