• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Fuel Cell Science and Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Fuel Cell Science and Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Hybrid System Test Rig: Start-up and Shutdown Physical Emulation

    Thumbnail
    View/Open
    JFCSAU-28941#021005_1.pdf (980.6Kb)
    Date
    2010
    Author
    Mario L. Ferrari
    Matteo Pascenti
    Loredana Magistri
    Aristide F. Massardo
    Metadata
    Show full item record
    Abstract
    The University of Genoa (TPG) has designed and developed an innovative test rig for high temperature fuel cell hybrid system physical emulation. It is based on the coupling of a modified commercial 100 kW recuperated micro gas turbine to a special modular volume designed for the experimental analysis of the interaction between different dimension fuel cell stacks and turbomachines. This new experimental approach that generates reliable results as a complete test rig also allows investigation of high risk situations with more flexibility without serious and expensive consequences to the equipment and at a very low cost compared with real hybrid configurations. The rig, developed with the support of the European Integrated Project “FELICITAS,” is under exploitation and improvement in the framework of the new European Integrated Project “LARGE-SOFC” started in January 2007. The layout of the system (connecting pipes, valves, and instrumentation) was carefully designed to minimize the pressure loss between compressor outlet and turbine inlet to have the highest plant flexibility. Furthermore, the servocontrolled valves are useful for performing tests at different operative conditions (i.e., pressures, temperatures, and pressure losses), focusing the attention on surge and thermal stress prevention. This work shows the preliminary data obtained with the machine connected to the volume for the test rig safe management to avoid surge or excessive stress, especially during the critical operative phases (i.e., start-up and shutdown). Finally, the attention is focused on the valve control system developed to emulate the start-up and shutdown phases for high temperature fuel cell hybrid systems. It is necessary to manage the flows in the connecting pipes, including an apt recuperator bypass, to perform a gradual heating up and cooling down as requested during these phases. It is an essential requirement to avoid thermal stress for the fuel cell stack. For this reason, during the start-up, the volume is gradually heated by the compressor outlet flow followed by a well managed recuperator outlet flow and vice versa for the shutdown. Furthermore, operating with a constant rotational speed control system, the machine load is used to reach higher temperature values typical of these kinds of systems.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/143653
    Collections
    • Journal of Fuel Cell Science and Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV