Show simple item record

dc.contributor.authorEphim Shirman
dc.contributor.authorAndrew Wojtanowicz
dc.date.accessioned2017-05-09T00:32:25Z
dc.date.available2017-05-09T00:32:25Z
dc.date.copyrightSeptember, 2009
dc.date.issued2009
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26563#033103_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/140355
dc.description.abstractDownhole water sink (DWS) well completions segregate production in the wellbore by producing water from the underlying aquifer and oil—from the oil zone of the reservoir. A pump drains water from the bottom completion to create a pressure drawdown that prevents water from coning up to the top, oil producing zone. Successful application of DWS technology in wells with water-coning problem requires effective isolation between the top and bottom completions of the well. Since DWS technology requires dual completion, the completion is configured for vertical interference testing. The problem is that such test involves flow of two fluids, water and oil. This paper presents a new mathematical model and analysis method for vertical interference testing using top completion (in the oil leg) for production and bottom completion (in the water leg) for observation. The model is analytical and accommodates partial penetration and permeability anisotropy. The analysis method employs a family of type-curves. Examples of possible applications of this new testing method are also shown in this paper.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleVertical Interference Test in Wells With Downhole Water Sink Completions
dc.typeJournal Paper
dc.journal.volume131
dc.journal.issue3
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.3194772
dc.journal.fristpage33103
dc.identifier.eissn1528-8994
dc.treeJournal of Energy Resources Technology:;2009:;volume( 131 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record