• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A Validation Methodology for a Combined Heating Cooling and Power (CHCP) Pilot Plant

    Thumbnail
    View/Open
    JERTD2-26522#285_1.pdf (154.0Kb)
    Date
    2004
    Author
    E. Cardona
    A. Piacentino
    Metadata
    Show full item record
    Abstract
    A great number of variables significantly influence the energetic, environmental and economic results of CHP (Combined Heating and Power) and CHCP (Combined Heating Cooling and Power) plants operation, and as a consequence their project activity is rather complex. In order to select the best layout and properly size the machines, detailed data on hourly electric, thermal, and cooling demand are necessary, so that a series of plant life cycle simulations may have to be carried out. Unfortunately, such detailed data are rarely available, because energy consumptions data for existing buildings are usually derived from aggregated monthly or bimonthly gas and electricity bills. Even more difficulties are encountered for new types of buildings, for which no consumptions data are available. In such cases, the most common procedure consists in performing, using case-oriented criteria, an estimate of the thermal and cooling consumption levels, and to refine it during construction, if necessary. This is the case of an existing medium size CHCP pilot plant for office buildings that covers the electrical, thermal, and cooling loads of two office buildings situated in a Mediterranean area (Palermo, Sicily, Italy). Estimated demand profiles were used; the effect on thermal demand of the conversion of the cooling load into thermal one through an absorption chiller was assessed. This is a very significant aspect in all warm climates zones. Cumulative curves were obtained for the aggregate thermal demand, by summing the heat direct applications and the heat consumptions for feeding the absorption chiller. In this paper the existing plant was compared with other plant configurations, varying both for machine sizes and management criterion, in order to affirm whether or not the plant selected by the designer in a simplified manner was or not an appropriate solution. The comparison was performed from an energetic and economic viewpoint.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/129914
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV