• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Inflow Performance and Pressure Interference in Dual-Completed Wells With Water Coning Control

    Thumbnail
    View/Open
    JERTD2-26506#253_1.pdf (268.6Kb)
    Date
    2002
    Author
    Andrew K. Wojtanowicz
    Ephim I. Shirman
    Metadata
    Show full item record
    Abstract
    Dual-completed wells with Downhole Water Sink (DWS) are used for water coning control in oil reservoirs with bottom water drive. In DWS wells, the second (bottom) completion—placed in the water column—is used for draining water. This prevents the water cone invasion and allows free oil inflow in the top completion. The decision on using DWS or a conventional (single-completed) well is based upon deliverability comparison of the two wells. This paper shows how to describe DWS well deliverability in terms of the top and bottom production rates, water cut, and pressure drawdown. Also, the effect of pressure interference between two well completions on deliverability limits has been studied and qualified experimentally. DWS well deliverability depends on two variables, pressure drawdown and water drainage rate, and is described by a three-dimensional Inflow Performance Domain (IPD). Visual-Basic software based on a new analytical model of IPD has been developed to calculate critical (fluid breakthrough) rates for oil and water. The critical rates identify inflow conditions to the well’s completions—single or two-phase inflow. Also calculated are the values of water cut and maximum pressure drawdown at the well. An example demonstrates the procedure and a complete IPD plot. The experimental study, using a Hele-Shaw physical model of DWS well, demonstrates the reduction of well’s deliverability caused by pressure interference from the second (bottom) completion. The experiments have shown, however, that the deliverability decrease is small and over-compensated by the increase of oil rate due to simultaneous reduction of water cut.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/126646
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV