• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The TransAlta High-Energy Piping Program—A Five-Year History

    Thumbnail
    View/Open
    JPVTAS-28407#65_1.pdf (348.3Kb)
    Date
    2001
    Author
    Marvin J. Cohn
    Manager
    Piping System Life Management
    Metadata
    Show full item record
    Abstract
    In 1995, the High-Energy Piping Strategic Management Plan (HEPSMP) was initiated at TransAlta Utilities Corporation (TAU) for the three generating facilities. At that time, it was recognized that several of the piping systems were exhibiting signs of creep relaxation, with some hangers bottomed or topped out online and/or offline. Previous hanger adjustment attempts were not always adequate. The program workscope included: 1) hot and cold piping system walkdowns, 2) selection of high-priority girth weld inspection locations, 3) examination of critical weldments, 4) weld repairs where necessary, 5) adjustments or modifications of malfunctioning steam line hangers, and 6) recommended work for future scheduled outages. Prior to 1996, examination locations were limited to the traditional locations of the terminal points at the boiler and turbine, with reexaminations occurring at arbitrary intervals. Since the terminal points are not necessarily the most highly stressed welds causing service-related creep damage, service damage may not occur first at the pre-1996 examined locations. There was a need to maximize the safety and integrity of these lines by ensuring that the highest risk welds were identified and given the highest priority for examination. An engineering consulting company was selected to prioritize the highest risk weldments for each piping system. This risk-based methodology included the prediction and evaluation of actual sustained loads, thermal expansion loads, operating loads, multiaxial stresses, creep relaxation, and cumulative creep life exhaustion. The technical process included detailed piping system walkdowns and application of advanced analytical techniques to predict and rank creep/fatigue damage for each piping system. TAU has concluded that the program has met its objective of successfully prioritizing inspection locations. The approach has also resulted in reducing the scope and cost of reexaminations. Phases 1 and 2 evaluations and examinations have been completed for all units. Results of some of the important aspects of this program are provided as case history studies.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/125773
    Collections
    • Journal of Pressure Vessel Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV