Show simple item record

dc.contributor.authorMamdouh M. Salama
dc.date.accessioned2017-05-09T00:02:17Z
dc.date.available2017-05-09T00:02:17Z
dc.date.copyrightMarch, 2000
dc.date.issued2000
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26487#29_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/123620
dc.description.abstractSand production may be inevitable in many fields that have a relatively low formation strength. Sand erosion and settling predictions and sand monitoring are important elements of any effective sand production management strategy. Sand erosion predictions are used to establish tolerable sand production rates, and, thus, well productivity, and to develop cost-effective inspection frequency for critical components. Prediction of critical flow rate to prevent sand settling is important for flowlines that are not designed for pigging. Quantitative sand monitoring is essential in verifying the effectiveness of sand control procedures and in generating an important input parameter for erosion and sand settling predictions. This paper presents equations for predicting sand erosion rate and sand settling flow rate, and assesses the accuracy of these equations. In addition, the paper presents an assessment of the sensitivity of commercially available nonintrusive acoustic and intrusive electrical resistance sand monitors. [S0195-0738(00)00201-6]
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleSand Production Management
dc.typeJournal Paper
dc.journal.volume122
dc.journal.issue1
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.483158
dc.journal.fristpage29
dc.journal.lastpage33
dc.identifier.eissn1528-8994
dc.keywordsSands
dc.keywordsFlow (Dynamics)
dc.keywordsErosion AND Velocity
dc.treeJournal of Energy Resources Technology:;2000:;volume( 122 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record