Show simple item record

dc.contributor.authorD. D. Mamora
dc.contributor.authorN. F. Saavedra
dc.contributor.authorD. B. Burnett
dc.contributor.authorF. M. Platt
dc.date.accessioned2017-05-08T23:59:28Z
dc.date.available2017-05-08T23:59:28Z
dc.date.copyrightMarch, 1999
dc.date.issued1999
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26480#40_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/122073
dc.description.abstractA laboratory study has been conducted on the use of chemical plugs, instead of conventional mechanical packers, to isolate water and gas-producing zones in horizontal wells. Results of experiments using horizontal wellbore models, consisting of PVC pipes internally lined with sand, indicate that slumping of the chemical plug could be avoided if the plug were spotted in a viscous brine pill. Of the three chemicals tested, a monomer, a polyacrylamide, and a plastic, only the plastic plug had a sufficiently high holding pressure. Research is being continued using a full-scale horizontal wellbore model.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleChemical Plug for Zone Isolation in Horizontal Wells
dc.typeJournal Paper
dc.journal.volume121
dc.journal.issue1
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.2795058
dc.journal.fristpage40
dc.journal.lastpage44
dc.identifier.eissn1528-8994
dc.keywordsWells
dc.keywordsPolyvinyl chloride pipes
dc.keywordsWater
dc.keywordsPressure AND Sands
dc.treeJournal of Energy Resources Technology:;1999:;volume( 121 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record