Show simple item record

dc.contributor.authorR. Yokoyama
dc.contributor.authorK. Ito
dc.date.accessioned2017-05-08T23:49:51Z
dc.date.available2017-05-08T23:49:51Z
dc.date.copyrightDecember, 1996
dc.date.issued1996
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26468#256_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/116805
dc.description.abstractAn operational planning problem for a cogeneration system is discussed under a complex utility rate structure which imposes demand charges due to total utility consumption over a specified period as well as demand and energy charges due to hourly utility consumption. Operational strategy of constituent equipment and contract demands for total utility consumption are assessed so as to minimize the operational cost over the period subject to energy demand requirement. This problem is formulated as a large-scale mixed-integer linear programming (MILP) one, and it is solved efficiently by a revised decomposition method for MILP problems with block angular structure. Through a numerical study on a gas engine-driven cogeneration system installed in a hotel or an office building, the effect of rate structure on operational strategy is clarified.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleOperational Strategy of a Cogeneration System Under a Complex Utility Rate Structure
dc.typeJournal Paper
dc.journal.volume118
dc.journal.issue4
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.2793871
dc.journal.fristpage256
dc.journal.lastpage262
dc.identifier.eissn1528-8994
dc.keywordsCombined heat and power
dc.keywordsLinear programming AND Engines
dc.treeJournal of Energy Resources Technology:;1996:;volume( 118 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record