| dc.contributor.author | T. A. Duffey | |
| dc.contributor.author | R. H. Warnes | |
| dc.contributor.author | J. M. Greene | |
| dc.date.accessioned | 2017-05-08T23:33:28Z | |
| dc.date.available | 2017-05-08T23:33:28Z | |
| dc.date.copyright | May, 1990 | |
| dc.date.issued | 1990 | |
| dc.identifier.issn | 0094-9930 | |
| dc.identifier.other | JPVTAS-28319#145_1.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/107411 | |
| dc.description.abstract | Conditions leading to the growth of initial imperfections for rings or long cylindrical shells subjected to initial uniform inward impulsive velocity loading are investigated. The work is motivated by a need to prevent buckling of rings during the contracting ring test, which is used to determine intermediate strain rate compressive stress-strain data. A previous analysis by Abrahamson is extended to include deceleration of the ring during inward motion; and the results of this deceleration are found to greatly influence the growth of imperfections (buckling). Qualitative comparisons with experimental data are presented. | |
| dc.publisher | The American Society of Mechanical Engineers (ASME) | |
| dc.title | Growth of Buckling Instabilities During Radial Collapse of a Ring | |
| dc.type | Journal Paper | |
| dc.journal.volume | 112 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Journal of Pressure Vessel Technology | |
| dc.identifier.doi | 10.1115/1.2928600 | |
| dc.journal.fristpage | 145 | |
| dc.journal.lastpage | 151 | |
| dc.identifier.eissn | 1528-8978 | |
| dc.keywords | Buckling | |
| dc.keywords | Collapse | |
| dc.keywords | Motion | |
| dc.keywords | Stress AND Pipes | |
| dc.tree | Journal of Pressure Vessel Technology:;1990:;volume( 112 ):;issue: 002 | |
| dc.contenttype | Fulltext | |