Show simple item record

dc.contributor.authorG. C. Slagis
dc.date.accessioned2017-05-08T23:27:58Z
dc.date.available2017-05-08T23:27:58Z
dc.date.copyrightAugust, 1988
dc.date.issued1988
dc.identifier.issn0094-9930
dc.identifier.otherJPVTAS-28303#329_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/104343
dc.description.abstractMuch of the piping in a nuclear plant is designed to the ASME Boiler and Pressure Vessel Code, Section III, Class 2 or 3 requirements. The Code rules are given in NC/ND-3600 of Section III. These rules were developed from the B31.1 rules, and incorporated into Section III 1971 for nuclear components. However, the Class 2/3 piping Code requirements have changed significantly since that time. There is not a criteria document available from ASME that describes the Class 2/3 piping rules. The purpose of this paper is to provide background information and a discussion of the Code stress limits so that the piping analyst can properly interpret the meaning of the Code requirements.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleCommentary on Class 2/3 Piping Rules
dc.typeJournal Paper
dc.journal.volume110
dc.journal.issue3
dc.journal.titleJournal of Pressure Vessel Technology
dc.identifier.doi10.1115/1.3265607
dc.journal.fristpage329
dc.journal.lastpage334
dc.identifier.eissn1528-8978
dc.keywordsPipes
dc.keywordsASME Boiler and Pressure Vessel Code
dc.keywordsNuclear power stations AND Stress
dc.treeJournal of Pressure Vessel Technology:;1988:;volume( 110 ):;issue: 003