Show simple item record

dc.contributor.authorA. J. Shashaty
dc.date.accessioned2017-05-08T23:22:19Z
dc.date.available2017-05-08T23:22:19Z
dc.date.copyrightMarch, 1986
dc.date.issued1986
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26410#48_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/101061
dc.description.abstractCable is normally recovered by hauling in from ahead, with the cable guiding the ship. In an early paper, Zajac presented a method for recovery, proposed by Shea, in which the cable is overrun, and hauled in tending aft. The potential advantage is lower tension in recovery. Cable was recovered with overrun in two recent exercises. The tensions and cable angles observed at the ship in these exercises are used to work out cable configurations and bottom tensions. The calculations show that the bottom tension was considerably less than it is for normal recovery in both exercises. As the overrun is increased, the tension decreases, and tends to a limiting value defined by the ship speed and the slack rate at which the cable was originally laid. Recovery with overrun is practical and advantageous.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleCable Recovery With Overrun
dc.typeJournal Paper
dc.journal.volume108
dc.journal.issue1
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.3231240
dc.journal.fristpage48
dc.journal.lastpage51
dc.identifier.eissn1528-8994
dc.keywordsCables
dc.keywordsShips AND Tension
dc.treeJournal of Energy Resources Technology:;1986:;volume( 108 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record