Show simple item record

dc.contributor.authorE. P. Fahrenthold
dc.contributor.authorJ. B. Cheatham
dc.date.accessioned2017-05-08T23:22:14Z
dc.date.available2017-05-08T23:22:14Z
dc.date.copyrightDecember, 1986
dc.date.issued1986
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26414#321_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/101016
dc.description.abstractProduction rate limits for perforated casing completions in weak rock formations are estimated for a material obeying a quadratic yield condition. Plastic stresses around a spherical cavity are calculated to determine the well pressure value which precipitates solids production. Elastic solutions for a cylindrical cavity are utilized to place upper and lower bounds on the well pressure value which initiates yielding around a perforated casing. The separate analyses define consistent critical well pressure values for initial yield and solids production as a function of rock properties and in-situ conditions.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleIncipient Yielding and Solids Production for Perforated Casing Completions
dc.typeJournal Paper
dc.journal.volume108
dc.journal.issue4
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.3231284
dc.journal.fristpage321
dc.journal.lastpage325
dc.identifier.eissn1528-8994
dc.keywordsSolids
dc.keywordsPressure
dc.keywordsCavities
dc.keywordsRocks AND Stress
dc.treeJournal of Energy Resources Technology:;1986:;volume( 108 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record