Show simple item record

contributor authorSou-Sen Leu
contributor authorChung-Huei Yang
date accessioned2017-05-08T22:40:32Z
date available2017-05-08T22:40:32Z
date copyrightDecember 1999
date issued1999
identifier other%28asce%290733-9364%281999%29125%3A6%28420%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86034
description abstractResources for construction activities are limited in the real construction world. To avoid the waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A multicriteria computational optimal scheduling model, which integrates the time/cost trade-off model, resource-limited model, and resource leveling model, is proposed. A searching technique using genetic algorithms (GAs) is adopted in the model. Furthermore, the nondominated solutions are found by the multiple attribute decision-making method, technique for order preference by similarity to ideal solution. The model can effectively provide the optimal combination of construction durations, resource amounts, minimum direct project costs, and minimum project duration under the constraint of limited resources.
publisherAmerican Society of Civil Engineers
titleGA-Based Multicriteria Optimal Model for Construction Scheduling
typeJournal Paper
journal volume125
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1999)125:6(420)
treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record